Gulf LNG Interconnect Project
From the ProvenHand pipeline wiki
Gulf LNG Interconnect Project is a natural gas pipeline in Mississippi, operated by Gulfstream Natural Gas System LLC. It was built and entered service in 2011.
| Gulf LNG Interconnect Project | |
|---|---|
| General information | |
| Status | In service[1] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Mississippi[2] |
| Counties | Jackson[2] |
| Approved | 10 May 2011[1] |
| Construction started | 17 May 2011[4] |
| In service | 19 August 2011[1] |
| FERC docket | CP11-111[3] |
| Contractors | |
| On ProvenHand | |
| Hands listed | 0 |
Gulf LNG Interconnect Project is a natural gas pipeline in Mississippi, operated by Gulfstream Natural Gas System LLC. It was built and entered service in 2011.
Contractorsedit
| Contractor | Work | Years |
|---|---|---|
| L.E. Bell Construction Company[4] | Prime | from 17 May 2011 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulf LNG Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Final Weekly Status Report, Gulf LNG Interconnect Project (CP11-111)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 19 August 2011. Retrieved 4 October 2026.
- “Supplemental Information, Gulf LNG Interconnect Project (CP11-111)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 8 March 2011. Retrieved 4 October 2026.
- “FERC eLibrary docket CP11-111”. Federal Energy Regulatory Commission. 1 March 2011. Retrieved 3 October 2026.
- “Weekly Status Report, Gulf LNG Interconnect Project, May 17-23, 2011 (CP11-111)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 25 May 2011. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.