Gulfstream Phase VI Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Gulfstream Phase VI Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Gulfstream Natural Gas System LLC. It runs 4 miles of 36" pipe.

Gulfstream Phase VI Expansion Project
Also calledGulfstream Natural Gas System Phase VI Expansion Project[1], Phase VI Expansion Project[1]
General information
KindPipeline project[2]
Project typeExpansion[1][2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StatesAlabama, Florida[2]
CountiesAlabama: Mobile
Florida: Manatee
[4]
Approved19 March 2020[4]
In service12 July 2022[2] or 15 July 2022[3][sources disagree]
FERC docketCP19-475[2]
Technical information
Length4 mi[2]
Pipe size36"[2][4]
Capacity78 MMcf/d additional capacity (EIA)[2]
Units added1 (gas turbine)[4]
Cost$154.6 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Gulfstream Phase VI Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Gulfstream Natural Gas System LLC. It runs 4 miles of 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 12 July 2022[2]
  • 15 July 2022[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulfstream Phase VI Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP19-475”. Federal Energy Regulatory Commission. 3 June 2019. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Phase VI Expansion Project (CP19-475)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 18 July 2022. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Gulfstream Natural Gas System, L.L.C. (CP19-475)”. Federal Energy Regulatory Commission. 19 March 2020. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.