Gulfstream Phase VI Expansion Project
From the ProvenHand pipeline wiki
Gulfstream Phase VI Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Gulfstream Natural Gas System LLC. It runs 4 miles of 36" pipe.
| Gulfstream Phase VI Expansion Project | |
|---|---|
| Also called | Gulfstream Natural Gas System Phase VI Expansion Project[1], Phase VI Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1][2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| States | Alabama, Florida[2] |
| Counties | Alabama: Mobile Florida: Manatee[4] |
| Approved | 19 March 2020[4] |
| In service | 12 July 2022[2] or 15 July 2022[3][sources disagree] |
| FERC docket | CP19-475[2] |
| Technical information | |
| Length | 4 mi[2] |
| Pipe size | 36"[2][4] |
| Capacity | 78 MMcf/d additional capacity (EIA)[2] |
| Units added | 1 (gas turbine)[4] |
| Cost | $154.6 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Gulfstream Phase VI Expansion Project is a natural gas pipeline expansion in Alabama and Florida, operated by Gulfstream Natural Gas System LLC. It runs 4 miles of 36" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulfstream Phase VI Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP19-475”. Federal Energy Regulatory Commission. 3 June 2019. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service, Phase VI Expansion Project (CP19-475)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 18 July 2022. Retrieved 4 October 2026.
- “Order Issuing Certificate, Gulfstream Natural Gas System, L.L.C. (CP19-475)”. Federal Energy Regulatory Commission. 19 March 2020. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.