Gulfstream Pipeline Phase 2

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Gulfstream Pipeline Phase 2 is a natural gas pipeline lateral in Florida. Construction began in 2004. It runs 110 miles of 24", 30" pipe.

Gulfstream Pipeline Phase 2
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
StateFlorida[1]
Construction started2004[2]
In service31 January 2005[1] or February 2005[3][sources disagree]
FERC docketCP00-6[1]
Technical information
Length110 mi[1][3]
Pipe size24", 30"[1]
Capacity175 MMcf/d additional capacity (EIA)[1]
Capacity addedincrease of long-term transportation volumes by 350 million cubic feet per day[3]
Cost$237 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Gulfstream Pipeline Phase 2 is a natural gas pipeline lateral in Florida. Construction began in 2004. It runs 110 miles of 24", 30" pipe.

Pipe mills

MillDiameterGradeYears
Berg Pipe Panama City Corp.[4]30 inX701 January 2004

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 31 January 2005[1]
  • February 2005[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulfstream Pipeline Phase 2? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Williams second-quarter 2004 results (8-K exhibit 99.1): Gas Pipeline second-quarter accomplishments”. The Williams Companies, Inc. (SEC filing). 5 August 2004. Retrieved 4 October 2026.
  3. “The Williams Companies, Inc. annual report on Form 10-K for the year ended December 31, 2005”. The Williams Companies, Inc. (filed with the SEC). 9 March 2006. Retrieved 4 October 2026.
  4. “Project List (BSPC Reference List), bergpipe.com, 2009 capture”. Berg Steel Pipe Corp. (Berg Pipe). Archived from the original on 16 July 2009. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.