Gulfstream Pipeline Phase 5
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Gulfstream Pipeline Phase 5 is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC.
| Gulfstream Pipeline Phase 5 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Florida[1] |
| Counties | Manatee[3] |
| Approved | 18 March 2010[3] |
| In service | April 2011[1] or 1 April 2011[4][sources disagree] |
| FERC docket | CP10-4[1] |
| Contractors | |
| Technical information | |
| Capacity | 35 MMcf/d additional capacity (EIA)[1] |
| Units added | 1 × Solar Titan 130 (gas turbine)[3] |
| Horsepower added | 20,500 hp[3] |
| Cost | $50.8 million (EIA estimate; no dollar year given)[1] or $35,306,435 (post-construction forecast of total expenditures in the 2011 project cost report; estimate was $50,759,100)[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Gulfstream Pipeline Phase 5 is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Alliance Engineering[6] | engineering, design and procurement support services | Expansion of Compressor Station 420 (the fifth phase, in service April 2011) |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Gulfstream Pipeline Phase 5? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP10-4”. Federal Energy Regulatory Commission. 9 October 2009. Retrieved 3 October 2026.
- “Order Issuing Certificate, Gulfstream Natural Gas System, L.L.C., Phase V Expansion Project (CP10-4)”. Federal Energy Regulatory Commission. 18 March 2010. Retrieved 4 October 2026.
- “Notice of Commencement of Service, Phase V Expansion Project (CP10-4)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 4 April 2011. Retrieved 4 October 2026.
- “Project Cost Report, Phase V Expansion Project (CP10-4)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 30 September 2011. Retrieved 4 October 2026.
- “Gulfstream Natural Gas Pipeline”. Offshore Technology. 29 October 2012. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.