Gulfstream Pipeline Phase 5

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Gulfstream Pipeline Phase 5 is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC.

Gulfstream Pipeline Phase 5
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateFlorida[1]
CountiesManatee[3]
Approved18 March 2010[3]
In serviceApril 2011[1] or 1 April 2011[4][sources disagree]
FERC docketCP10-4[1]
Contractors
Technical information
Capacity35 MMcf/d additional capacity (EIA)[1]
Units added1 × Solar Titan 130 (gas turbine)[3]
Horsepower added20,500 hp[3]
Cost$50.8 million (EIA estimate; no dollar year given)[1] or $35,306,435 (post-construction forecast of total expenditures in the 2011 project cost report; estimate was $50,759,100)[5][sources disagree]
On ProvenHand
Hands listed0

Gulfstream Pipeline Phase 5 is a natural gas pipeline lateral in Florida, operated by Gulfstream Natural Gas System LLC.

Contractorsedit

ContractorWorkScope
Alliance Engineering[6]engineering, design and procurement support servicesExpansion of Compressor Station 420 (the fifth phase, in service April 2011)

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $50.8 million (EIA estimate; no dollar year given)[1]
  • $35,306,435 (post-construction forecast of total expenditures in the 2011 project cost report; estimate was $50,759,100)[5]
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Gulfstream Pipeline Phase 5? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP10-4”. Federal Energy Regulatory Commission. 9 October 2009. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Gulfstream Natural Gas System, L.L.C., Phase V Expansion Project (CP10-4)”. Federal Energy Regulatory Commission. 18 March 2010. Retrieved 4 October 2026.
  4. “Notice of Commencement of Service, Phase V Expansion Project (CP10-4)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 4 April 2011. Retrieved 4 October 2026.
  5. “Project Cost Report, Phase V Expansion Project (CP10-4)”. Gulfstream Natural Gas System, L.L.C. (filed with FERC). 30 September 2011. Retrieved 4 October 2026.
  6. “Gulfstream Natural Gas Pipeline”. Offshore Technology. 29 October 2012. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.