Hanging Rock Lateral Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Hanging Rock Lateral Project is a natural gas pipeline lateral in Ohio, operated by Texas Eastern Transmission, LP. It entered service in 2002. It runs 9.6 miles of 24" pipe.

Hanging Rock Lateral Project
Also calledTETCO Hanging Rock Lateral[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateOhio[1][2]
Approved12 June 2002[1]
In serviceDecember 2002[2]
FERC docketCP02-45[1]
Technical information
Length9.6 mi[1][2]
Pipe size24"[2]
Capacity250 MMcf/d (FERC project list)[1] or 289 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$15 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Hanging Rock Lateral Project is a natural gas pipeline lateral in Ohio, operated by Texas Eastern Transmission, LP. It entered service in 2002. It runs 9.6 miles of 24" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 250 MMcf/d (FERC project list)[1]
  • 289 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Hanging Rock Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.