Hardin Compressor Replacement Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Hardin Compressor Replacement Project is a pipeline project, operated by WBI Energy Transmission, Inc..
| Hardin Compressor Replacement Project | |
|---|---|
| General information | |
| Project type | Replacement[1] or Rebuild[2][sources disagree] |
| Status | Approved[2] |
| Owner and operator | |
| Counties | Big Horn[2] |
| FERC docket | CP25-82[1] |
| Technical information | |
| Units added | 2 × Ariel KBT/4 (Waukesha L7044GSI S5 engine)[2] |
| Cost | $18 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Hardin Compressor Replacement Project is a pipeline project, operated by WBI Energy Transmission, Inc..
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Hardin Compressor Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-82”. Federal Energy Regulatory Commission. 24 February 2025. Retrieved 3 October 2026.
- “Environmental Assessment Report for WBI Energy Transmission, Inc.'s Section 2.55(b)(3) Advance Notification of Replacement of Facilities under CP25-82.”. Federal Energy Regulatory Commission (staff document). 28 February 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.