Hardinsburg Replacement Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Hardinsburg Replacement Project is a pipeline project in Kentucky, operated by Texas Gas Transmission, LLC.

Hardinsburg Replacement Project
General information
Project typeReplacement[1] or Rebuild[2][sources disagree]
Owner and operator
StateKentucky[2]
CountiesBreckinridge[2]
FERC docketCP16-6[1]
Technical information
Units added1 × Solar Mars 100-T15000S (turbine, 13,290 hp each)[2]
On ProvenHand
Hands listed0

Hardinsburg Replacement Project is a pipeline project in Kentucky, operated by Texas Gas Transmission, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Project type

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Hardinsburg Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP16-6”. Federal Energy Regulatory Commission. 13 October 2015. Retrieved 3 October 2026.
  2. “Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP16-6-000), Federal Register 2015-27400”. Federal Energy Regulatory Commission (published in the Federal Register). 28 October 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.