Heartland Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Heartland Project is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company.
| Heartland Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | Approved[2] or Under construction[3][sources disagree] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Illinois, Wisconsin[2][4][5] |
| Approved | 22 January 2026[4] |
| FERC docket | CP25-79[1] |
| FERC pre-filing docket | PF24-3[1] |
| Technical information | |
| Length | 68.9 mi[4][5] or 69 mi[2][sources disagree] |
| Pipe size | 12", 30", 36", 42"[2] |
| Capacity | 473 MMcf/d (FERC project list)[2][4][5] |
| Cost | $902 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Heartland Project is a natural gas pipeline expansion in Illinois and Wisconsin, operated by ANR Pipeline Company.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Heartland Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-79”. Federal Energy Regulatory Commission. 20 February 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Variance Request No. 2 to add two contractor yards along Segment PL-1 et al. of the Heartland Project, ANR Pipeline Company (CP25-79)”. ANR Pipeline Company (filed with FERC; eLibrary filing description). 30 September 2026. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.