Henderson-Dogtown 8-Line Project is a natural gas pipeline lateral in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 9.4 miles of 8" pipe.

Henderson-Dogtown 8-Line Project
Also calledHenderson-Dogtown 8-Inch Line Project[1]
General information
KindPipeline project[2]
Project typeLateral[2][3]
CommodityNatural gas[1]
Owner and operator
StatesIndiana, Kentucky[1]
CountiesIndiana: Vanderburgh
Kentucky: Henderson
[1][3]
FERC docketCP08-77[2]
Technical information
Length9.4 mi[1][3]
Pipe size8"[1][3]
Capacitydesigned to deliver 36 MMcf/d to the new interconnection point[1]
Cost$12,230,000[1][3]
On ProvenHand
Hands listed0

Henderson-Dogtown 8-Line Project is a natural gas pipeline lateral in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 9.4 miles of 8" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Henderson-Dogtown 8-Line Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Notice of request under blanket authorization, Texas Gas Transmission, LLC (CP08-77)”. FERC. 6 March 2008. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP08-77”. Federal Energy Regulatory Commission. 21 February 2008. Retrieved 3 October 2026.
  3. “Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-77-000), Federal Register E8-5025”. Federal Energy Regulatory Commission (published in the Federal Register). 13 March 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.