Henderson-Dogtown 8-Line Project is a natural gas pipeline lateral in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 9.4 miles of 8" pipe.
| Henderson-Dogtown 8-Line Project | |
|---|---|
| Also called | Henderson-Dogtown 8-Inch Line Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2][3] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| States | Indiana, Kentucky[1] |
| Counties | Indiana: Vanderburgh Kentucky: Henderson[1][3] |
| FERC docket | CP08-77[2] |
| Technical information | |
| Length | 9.4 mi[1][3] |
| Pipe size | 8"[1][3] |
| Capacity | designed to deliver 36 MMcf/d to the new interconnection point[1] |
| Cost | $12,230,000[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Henderson-Dogtown 8-Line Project is a natural gas pipeline lateral in Indiana and Kentucky, operated by Texas Gas Transmission, LLC. It runs 9.4 miles of 8" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Henderson-Dogtown 8-Line Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Notice of request under blanket authorization, Texas Gas Transmission, LLC (CP08-77)”. FERC. 6 March 2008. Retrieved 4 October 2026.
- “FERC eLibrary docket CP08-77”. Federal Energy Regulatory Commission. 21 February 2008. Retrieved 3 October 2026.
- “Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-77-000), Federal Register E8-5025”. Federal Energy Regulatory Commission (published in the Federal Register). 13 March 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.