Herscher Discharge Line Project
From the ProvenHand pipeline wiki
Herscher Discharge Line Project is a natural gas pipeline replacement in Illinois, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2023. It runs 2.2 miles of 36" pipe.
| Herscher Discharge Line Project | |
|---|---|
| Also called | Herscher Discharge Line Relocation Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[3] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Illinois[3] |
| Counties | Grundy, Will[3] |
| Construction started | 6 July 2023[1] |
| FERC docket | CP23-255[2] |
| Technical information | |
| Length | 2.2 mi[3] |
| Pipe size | 36"[3] |
| Cost | $14,000,000[3] |
| On ProvenHand | |
| Hands listed | 0 |
Herscher Discharge Line Project is a natural gas pipeline replacement in Illinois, operated by Natural Gas Pipeline Company of America LLC. Construction began in 2023. It runs 2.2 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Herscher Discharge Line Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Weekly Status Report No. 1, Herscher Discharge Line Relocation Project (CP23-255)”. Natural Gas Pipeline Company of America LLC (filed with FERC). 11 July 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-255”. Federal Energy Regulatory Commission. 26 April 2023. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Natural Gas Pipeline Company of America LLC (CP23-255)”. Federal Energy Regulatory Commission. 4 May 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.