High Desert Lateral Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

High Desert Lateral Project is a natural gas pipeline lateral in California, operated by Kern River Gas Transmission Company. It entered service in 2002.

High Desert Lateral Project
Also calledKR High Desert Lateral[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateCalifornia[1][2]
Approved24 April 2002[1]
In serviceSeptember 2002[2]
FERC docketCP01-405[1]
Technical information
Length31.6 mi[1] or 32 mi[2][sources disagree]
Pipe size24"[2]
Capacity282 MMcf/d (FERC project list)[1] or 275 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$29 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

High Desert Lateral Project is a natural gas pipeline lateral in California, operated by Kern River Gas Transmission Company. It entered service in 2002.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 282 MMcf/d (FERC project list)[1]
  • 275 MMcf/d additional capacity (EIA)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on High Desert Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.