Hiland Express Spine Pipeline Project
From the ProvenHand pipeline wiki
Hiland Express Spine Pipeline Project is an NGL pipeline in North Dakota, operated by Hiland Crude, LLC. Construction began in 2025. It runs 28.1 miles of 10" pipe.
| Hiland Express Spine Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Status | In service[3] |
| Commodity | NGL[2] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | McKenzie[2] |
| Approved | 7 August 2025[2] |
| Construction started | 25 August 2025[3] |
| North Dakota PSC case | PU-25-084[1] |
| Contractors | |
| Technical information | |
| Length | 28.1 mi[2] |
| Pipe size | 10"[2] |
| Capacity | maximum design capacity of 80,000 barrels per day[2] |
| Cost | estimated cost of the Project is approximately $37.2 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Hiland Express Spine Pipeline Project is an NGL pipeline in North Dakota, operated by Hiland Crude, LLC. Construction began in 2025. It runs 28.1 miles of 10" pipe.
Contractorsedit
| Contractor | Work |
|---|---|
| Loenbro Construction Company, Inc.[3] | Prime |
| Diamond Resources Co.[4] | right-of-way agent for Hiland (listed as ROW Agent in the pre-construction minutes) |
Inspection
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Hiland Express Spine Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Findings of Fact, Conclusions of Law and Order, Case No. PU-25-084 (Hiland Express Spine Pipeline)”. North Dakota Public Service Commission. 7 August 2025. Retrieved 3 October 2026.
- “As-Built Inspection Report, Hiland Express Spine Pipeline, PU-25-84”. Stantec Consulting Services Inc. (filed with the North Dakota Public Service Commission). 31 July 2026. Retrieved 3 October 2026.
- “Preconstruction conference call minutes (2025-08-19) and notice of intent to start construction, Hiland Express Pipeline Project, PU-25-084”. Hiland Crude, LLC (filed with the North Dakota Public Service Commission). 19 August 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.