Hoback Pipeline Energy Project
From the ProvenHand pipeline wiki
Hoback Pipeline Energy Project is a natural gas pipeline in Wyoming, operated by Lower Valley Energy Coop. It entered service in 2008. It runs 49.8 miles of 6" pipe.
| Hoback Pipeline Energy Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Wyoming[1] |
| In service | 12 December 2008[1] |
| Technical information | |
| Length | 49.8 mi[1] |
| Pipe size | 6"[1] |
| Capacity | 5.81 MMcf/d additional capacity (EIA)[1] |
| Cost | $20 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Hoback Pipeline Energy Project is a natural gas pipeline in Wyoming, operated by Lower Valley Energy Coop. It entered service in 2008. It runs 49.8 miles of 6" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Hoback Pipeline Energy Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.