Holbrook Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Cameron Interstate Pipeline, LLC.

Holbrook Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusApproved[1][3]
CommodityNatural gas[1]
Operator
Owner and operator
StateLouisiana[1]
CountiesCalcasieu[4]
Approved17 October 2024[4][5]
FERC docketCP24-1[2]
Technical information
Capacity1079 MMcf/d additional capacity (EIA)[1] or 1,079,000 Dth/d of additional firm transportation[4][sources disagree]
Horsepower added47,350 hp[4] or 82,350 hp[6][sources disagree]
Cost$90 million (EIA estimate; no dollar year given)[1] or approximately $90,211,248[4][sources disagree]
On ProvenHand
Hands listed0

Holbrook Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Cameron Interstate Pipeline, LLC.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1079 MMcf/d additional capacity (EIA)[1]
  • 1,079,000 Dth/d of additional firm transportation[4]
Cost
  • $90 million (EIA estimate; no dollar year given)[1]
  • approximately $90,211,248[4]
Horsepower added

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Holbrook Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP24-1”. Federal Energy Regulatory Commission. 4 October 2023. Retrieved 3 October 2026.
  3. “Quarterly Status Report No. 1 (January to March 2026), Holbrook Expansion Project (CP24-1)”. Cameron Interstate Pipeline, LLC (filed with FERC). 13 April 2026. Retrieved 4 October 2026.
  4. “Order Issuing Certificate, Cameron Interstate Pipeline, LLC, Holbrook Expansion Project (CP24-1)”. Federal Energy Regulatory Commission (eLibrary filing). 17 October 2024. Retrieved 3 October 2026.
  5. “Quarterly Status Report No. 3 (July to September 2026), Holbrook Expansion Project (CP24-1)”. Federal Energy Regulatory Commission (eLibrary filing). 1 October 2026. Retrieved 3 October 2026.
  6. “Holbrook Expansion Project”. Sempra Infrastructure (project page). Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.