Horseshoe Lake Lateral (A-334)

From the ProvenHand pipeline wiki

Horseshoe Lake Lateral (A-334) is a natural gas pipeline lateral in Illinois. It entered service in 2005. It runs 3.6 miles of 20" pipe.

Horseshoe Lake Lateral (A-334)
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
StateIllinois[1]
In serviceMay 2005[1]
FERC docketCP04-346[1]
Technical information
Length3.6 mi[1]
Pipe size20"[1]
Capacity134 MMcf/d additional capacity (EIA)[1]
Cost$18.02 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Horseshoe Lake Lateral (A-334) is a natural gas pipeline lateral in Illinois. It entered service in 2005. It runs 3.6 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Horseshoe Lake Lateral (A-334)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.