Houston Pipe Line Border Crossing Project is a natural gas pipeline expansion in Texas, operated by Houston Pipe Line Company LP. It entered service in 2015.
| Houston Pipe Line Border Crossing Project | |
|---|---|
| Also called | Edinburg Lateral[1], 24-Inch Border Crossing Project[2] |
| General information | |
| Kind | Pipeline project[3] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Texas[1][3] |
| Counties | Hidalgo[4] |
| Approved | 20 March 2014[3] |
| In service | 8 June 2015[1] |
| FERC docket | CP14-13[3] |
| Technical information | |
| Length | 0.1 mi[3] or 23 mi[1][sources disagree] |
| Pipe size | 24"[1] |
| Capacity | 140 MMcf/d (FERC project list)[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Houston Pipe Line Border Crossing Project is a natural gas pipeline expansion in Texas, operated by Houston Pipe Line Company LP. It entered service in 2015.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Houston Pipe Line Border Crossing Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Intent to Prepare an Environmental Assessment for the Proposed 24-Inch Border Crossing Project, Houston Pipe Line Company (CP14-13)”. Federal Energy Regulatory Commission. 18 December 2013. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Office of Energy Projects Energy Infrastructure Update for June 2015”. Federal Energy Regulatory Commission. 30 June 2015. Retrieved 3 October 2026.