I-595 Replacement Project is a natural gas pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2014.
| I-595 Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Florida[3] |
| Counties | Broward[3] |
| Approved | 6 June 2013[4] |
| Construction started | 4 February 2014[4] |
| In service | 17 May 2014[2] |
| FERC docket | CP12-501[1] |
| FERC pre-filing docket | PF12-5[1] |
| Technical information | |
| Pipe size | 36"[3] |
| On ProvenHand | |
| Hands listed | 0 |
I-595 Replacement Project is a natural gas pipeline replacement in Florida, operated by Florida Gas Transmission Company, LLC. It was built and entered service in 2014.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on I-595 Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP12-501”. Federal Energy Regulatory Commission. 16 August 2012. Retrieved 3 October 2026.
- “Notification of Commencement of Service, I-595 Replacement Project (CP12-501)”. Florida Gas Transmission Company, LLC (filed with FERC). 19 May 2014. Retrieved 4 October 2026.
- “Environmental Assessment, I-595 Replacement Project (CP12-501)”. FERC. 30 November 2012. Retrieved 4 October 2026.
- “Notice of Commencement of Construction, I-595 Replacement Project (CP12-501)”. Florida Gas Transmission Company, LLC (filed with FERC). 6 February 2014. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.