Impulsora Pipeline CP14-513 is a natural gas pipeline in Texas, operated by Impulsora Pipeline.
| Impulsora Pipeline CP14-513 | |
|---|---|
| Also called | Impulsora Pipeline Crossing Project[1] |
| General information | |
| Kind | Pipeline project[1][2] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1][3] |
| Operators | |
| Owner and operator | |
| State | Texas[1][2] |
| Counties | Webb[3][5] |
| Approved | 14 May 2015[2][5] |
| In service | 30 May 2018[1] or 27 December 2017[1][4][sources disagree] |
| FERC dockets | CP14-513[2], CP16-70[5] |
| Contractors | |
| Technical information | |
| Length | 1.2 mi[2] or 1 mi[1][sources disagree] |
| Pipe size | 36"[1][4] |
| Capacity | 1120 MMcf/d (FERC project list)[1][2] |
| Cost | $13.8 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Impulsora Pipeline CP14-513 is a natural gas pipeline in Texas, operated by Impulsora Pipeline.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Pumpco, Inc.[6] | HDD and bore | HDD crossing of the Rio Grande at Laredo: 2,200 ft of 36-inch pulled back about 80 ft under the river bed, the last leg of the Impulsora Pipeline; Rio Grande |
Inspection
| Firm | Scope |
|---|---|
| SWCA Environmental Consultants[7] | third-party weekly environmental inspection during construction (status report schedule lists SWCA Weekly Inspection, Oct-Nov 2016) |
Crossings
| Feature | Method | Contractor |
|---|---|---|
| Rio Grande[5][6] | HDD | Pumpco, Inc. |
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Impulsora Pipeline CP14-513? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Order Issuing Presidential Permit and Granting Authorization under Section 3, Impulsora Pipeline, LLC (CP14-513)”. Federal Energy Regulatory Commission. 14 May 2015. Retrieved 4 October 2026.
- “Notification, Impulsora Pipeline, LLC (CP14-513, CP16-70)”. Impulsora Pipeline, LLC (filed with FERC). 5 June 2018. Retrieved 4 October 2026.
- “Implementation Plan, Impulsora Border Crossing Project, Webb County, Texas (CP14-513-001, CP16-70-000)”. Impulsora Pipeline, LLC (filed with FERC). 24 June 2016. Retrieved 4 October 2026.
- “Crossing Under the Rio Grande for the Impulsora Pipeline”. Trenchless Technology. 12 September 2018. Retrieved 6 October 2026.
- “Biweekly Status Report, Impulsora Pipeline, LLC (CP14-513 et al.), with project schedule”. Impulsora Pipeline, LLC (filed with FERC). 8 July 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.