Iowa Fertilizer Project is a natural gas pipeline lateral in Iowa, operated by ANR Pipeline Company. Construction began in 2014. It runs 1.3 miles of 16" pipe.
| Iowa Fertilizer Project | |
|---|---|
| General information | |
| Project type | Lateral[1][2] |
| Status | Approved[2] or In service[3][sources disagree] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Iowa[2] |
| Counties | Des Moines, Jefferson, Lee[2] |
| Approved | 19 November 2013[3] |
| Construction started | 31 May 2014[3] |
| FERC docket | CP13-546[1] |
| Technical information | |
| Length | 1.3 mi[2] |
| Pipe size | 16"[2] |
| Capacity | up to 81,000 dekatherms per day[2] |
| Cost | $15,000,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Iowa Fertilizer Project is a natural gas pipeline lateral in Iowa, operated by ANR Pipeline Company. Construction began in 2014. It runs 1.3 miles of 16" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Iowa Fertilizer Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP13-546”. Federal Energy Regulatory Commission. 9 September 2013. Retrieved 3 October 2026.
- “Environmental Assessment Report, Iowa Fertilizer Project, ANR Pipeline Company (CP13-546)”. FERC. 18 November 2013. Retrieved 4 October 2026.
- “Final Weekly Environmental Inspector Report (No. 25), Iowa Fertilizer Project, ANR Pipeline Company (CP13-546)”. ANR Pipeline Company (filed with FERC). 20 November 2014. Retrieved 4 October 2026.
- “Notice of request under Blanket Authorization, ANR Pipeline Company, Iowa Fertilizer Project (CP13-546)”. FERC. 19 September 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.