Jim Bridger Delivery Project
From the ProvenHand pipeline wiki
Jim Bridger Delivery Project is a natural gas pipeline lateral in Wyoming, operated by MountainWest Overthrust Pipeline, LLC. It runs 1.2 miles of 24" pipe.
| Jim Bridger Delivery Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | Under construction[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Wyoming[2] |
| Counties | Sweetwater[2] |
| Approved | 21 July 2023[4] |
| FERC docket | CP23-478[1] |
| Technical information | |
| Length | 1.2 mi[2] |
| Pipe size | 24"[2] |
| Cost | $12,677,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Jim Bridger Delivery Project is a natural gas pipeline lateral in Wyoming, operated by MountainWest Overthrust Pipeline, LLC. It runs 1.2 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Jim Bridger Delivery Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-478”. Federal Energy Regulatory Commission. 12 May 2023. Retrieved 3 October 2026.
- “Environmental Assessment Report, Jim Bridger Delivery Project (CP23-478)”. FERC. 21 July 2023. Retrieved 4 October 2026.
- “Environmental Inspector's Weekly Construction Status Report No. 18 (Jan 8 to 14, 2024), Jim Bridger Delivery Project (CP23-478)”. MountainWest Overthrust Pipeline, LLC (filed with FERC). 17 January 2024. Retrieved 4 October 2026.
- “Weekly Status Report No. 1 (Aug 27 to Sept 2, 2023), Jim Bridger Delivery Project (CP23-478)”. MountainWest Overthrust Pipeline, LLC (filed with FERC). 5 September 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.