Joint Pipeline Expansion (SESH) Project is a natural gas pipeline expansion in Louisiana and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2011.

Joint Pipeline Expansion (SESH) Project
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[2]
CommodityNatural gas[2]
Operator
Owner and operator
StatesLouisiana, Mississippi[2]
CountiesLouisiana: Richland
Mississippi: Jefferson Davis
[4]
Approved27 August 2009[1]
In serviceJune 2011[2]
FERC docketCP09-40[1]
Technical information
Pipe size36", 42"[2]
Capacity360 MMcf/d additional capacity (EIA)[2]
Cost$69 million (EIA estimate; no dollar year given)[2] or $54,951,450 actual cost, all facilities (Exhibit K $67,687,059)[4][sources disagree]
On ProvenHand
Hands listed0

Joint Pipeline Expansion (SESH) Project is a natural gas pipeline expansion in Louisiana and Mississippi, operated by Southeast Supply Header, LLC. It entered service in 2011.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $69 million (EIA estimate; no dollar year given)[2]
  • $54,951,450 actual cost, all facilities (Exhibit K $67,687,059)[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Joint Pipeline Expansion (SESH) Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP09-40”. Federal Energy Regulatory Commission. 19 December 2008. Retrieved 3 October 2026.
  4. “Joint Pipeline Expansion Phase II Project Cost Report (CP09-40)”. Southeast Supply Header, LLC (filed with FERC). 30 November 2011. Retrieved 4 October 2026.