Joliet Booster Compressor Station Project is a natural gas facility project in Illinois, operated by ANR Pipeline Company. It was built and entered service in 2025.

Joliet Booster Compressor Station Project
Also calledYoungs Road Interconnect Project[1]
General information
KindFacility project[2]
Project typeAdded units[1]
StatusIn service[3]
CommodityNatural gas[1]
Owner and operator
StateIllinois[1]
CountiesWill[1]
Approved14 January 2025[2]
Construction startedMarch 2025[2]
In service9 October 2025[3]
FERC docketCP25-14[4]
Technical information
Units added1 (natural gas-fired reciprocating engine, 1,900 hp each)[1]
Horsepower added1,900 hp[1]
Cost$38 million (cost stated in FERC staff EA)[1]
On ProvenHand
Hands listed0

Joliet Booster Compressor Station Project is a natural gas facility project in Illinois, operated by ANR Pipeline Company. It was built and entered service in 2025.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Joliet Booster Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Youngs Road Interconnect Project at the Joliet Compressor Station (CP25-14)”. FERC. 13 January 2025. Retrieved 3 October 2026.
  2. “Weekly Construction Status Report No. 1 (March 17 to 23, 2025), Joliet Booster Compressor Station Project (CP25-14)”. ANR Pipeline Company (filed with FERC). 25 March 2025. Retrieved 3 October 2026.
  3. “Final Weekly Construction Status Report No. 30 (October 6 to 12, 2025), Joliet Booster Compressor Station Project (CP25-14)”. ANR Pipeline Company (filed with FERC). 28 October 2025. Retrieved 3 October 2026.
  4. “FERC eLibrary docket CP25-14”. Federal Energy Regulatory Commission. 4 November 2024. Retrieved 3 October 2026.