KA West and SM-123 Pipeline Relocation

From the ProvenHand pipeline wiki

KA West and SM-123 Pipeline Relocation is a natural gas pipeline replacement in West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2026. It runs 0.9 miles of 20", 24" pipe.

KA West and SM-123 Pipeline Relocation
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusUnder construction[3]
CommodityNatural gas[2]
Owner and operator
StateWest Virginia[1]
CountiesMingo[2]
Approved9 February 2026[1]
Construction startedFebruary 2026[4]
FERC docketCP26-15[2]
West Virginia stormwater permitWVR312548[1]
Technical information
Length0.9 mi[2]
Pipe size20", 24"[2]
Costapproximately $51 million[2]
On ProvenHand
Hands listed0

KA West and SM-123 Pipeline Relocation is a natural gas pipeline replacement in West Virginia, operated by Columbia Gas Transmission, LLC. Construction began in 2026. It runs 0.9 miles of 20", 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on KA West and SM-123 Pipeline Relocation? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
  2. “Prior Notice Request, Line KA West and Line SM-123 Relocation Project (CP26-15)”. Columbia Gas Transmission, LLC (filed with FERC). 27 October 2025. Retrieved 3 October 2026.
  3. “Weekly Status Report No. 38, Line KA West and Line SM-123 Relocation Project (CP26-15)”. Columbia Gas Transmission, LLC (filed with FERC). 1 October 2026. Retrieved 3 October 2026.
  4. “Weekly Status Report No. 6, Line KA West and Line SM-123 Relocation Project (CP26-15)”. Columbia Gas Transmission, LLC (filed with FERC). 17 February 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.