Kern River Gas Transmission 2010 Expansion Project
From the ProvenHand pipeline wiki
Kern River Gas Transmission 2010 Expansion Project is a natural gas pipeline expansion, operated by Kern River Gas Transmission Company. It entered service in 2010.
| Kern River Gas Transmission 2010 Expansion Project | |
|---|---|
| Also called | Mainline 2010 System Expansion[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| States | CA, WY[2] or NV, WY[1][sources disagree] |
| Approved | 4 June 2009[2] |
| In service | 9 April 2010[1][3] |
| FERC docket | CP08-429[2] |
| Technical information | |
| Pipe size | 36"[1] |
| Capacity | 145 MMcf/d (FERC project list)[1][2] |
| Units added | 1 × Solar Titan 130 (gas turbine)[4] |
| Horsepower added | 20,500 hp[5] |
| Cost | $62.1 million (EIA estimate; no dollar year given)[1][5] |
| On ProvenHand | |
| Hands listed | 0 |
Kern River Gas Transmission 2010 Expansion Project is a natural gas pipeline expansion, operated by Kern River Gas Transmission Company. It entered service in 2010.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Kern River Gas Transmission 2010 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notice of Commencement of Service, 2010 Expansion (CP08-429)”. Kern River Gas Transmission Company (filed with FERC). 19 April 2010. Retrieved 4 October 2026.
- “Monthly Status Report #1, 2010 Expansion Project (CP08-429)”. Kern River Gas Transmission Company (filed with FERC). 1 September 2009. Retrieved 4 October 2026.
- “Order Issuing Certificate, Kern River Gas Transmission Company, 2010 Expansion (CP08-429)”. Federal Energy Regulatory Commission. 4 June 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.