Kinder Morgan Interconnect Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Kinder Morgan Interconnect Project is a pipeline project.

Kinder Morgan Interconnect Project
General information
Owner and operator
CountiesAcadia[1]
FERC docketCP08-449[2]
Technical information
Capacityreceive 600 MMcf/d of revaporized LNG[1]
Cost$712,113 (Texas Gas estimate; reimbursed by KMLP)[1]
On ProvenHand
Hands listed0

Kinder Morgan Interconnect Project is a pipeline project.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Operator
  • TEXAS GAS TRANSMISSION, LLC[2]
  • Texas Gas Transmission, LLC[1]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Kinder Morgan Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-449-000), Federal Register E8-18995”. Federal Energy Regulatory Commission (published in the Federal Register). 18 August 2008. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP08-449”. Federal Energy Regulatory Commission. 1 August 2008. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.