Kinder Morgan Texas Pipeline Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Kinder Morgan Texas Pipeline Expansion Project is a natural gas pipeline expansion in Texas, operated by Kinder Morgan Texas Pipeline. It runs 30 miles of 30" pipe.

Kinder Morgan Texas Pipeline Expansion Project
Also calledWebb County Extension Project[1], KMTP system expansion[2]
General information
KindPipeline project[1]
Project typeExpansion[1]
StatusIn service[1]
CommodityNatural gas[1]
Operators
StateTexas[1]
In service2023[1] or October 2024[2] or 30 September 2024[1] or 1 October 2024[3][sources disagree]
Technical information
Length30 mi[1][2]
Pipe size30"[1][2]
Capacity500 MMcf/d additional capacity (EIA)[1] or up to 0.4 Bcf/d of Eagle Ford natural gas supply[2] or up to 0.5 Bcf/d of Eagle Ford natural gas supply[4] or 400 MMcf/d additional capacity (EIA)[1] or to deliver up to 0.4 Bcf/d of Eagle Ford natural gas supply[2][sources disagree]
Cost$180 million (EIA estimate; no dollar year given)[1][4] or $158 million[1][2][sources disagree]
On ProvenHand
Hands listed0

Kinder Morgan Texas Pipeline Expansion Project is a natural gas pipeline expansion in Texas, operated by Kinder Morgan Texas Pipeline. It runs 30 miles of 30" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 500 MMcf/d additional capacity (EIA)[1]
  • up to 0.4 Bcf/d of Eagle Ford natural gas supply[2]
  • up to 0.5 Bcf/d of Eagle Ford natural gas supply[4]
  • 400 MMcf/d additional capacity (EIA)[1]
  • to deliver up to 0.4 Bcf/d of Eagle Ford natural gas supply[2]
Cost
  • $180 million (EIA estimate; no dollar year given)[1][4]
  • $158 million[1][2]
In service
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Kinder Morgan Texas Pipeline Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Kinder Morgan, Inc. annual report on Form 10-K for the year ended December 31, 2024”. Kinder Morgan, Inc. (filed with the SEC). 13 February 2025. Retrieved 4 October 2026.
  3. “Kinder Morgan third-quarter 2024 results release (8-K exhibit 99.1)”. Kinder Morgan, Inc. (SEC filing). 16 October 2024. Retrieved 4 October 2026.
  4. “Kinder Morgan, Inc. annual report on Form 10-K for the year ended December 31, 2023”. Kinder Morgan, Inc. (filed with the SEC). 20 February 2024. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.