KM Midcon Texas Pipeline Expansion
From the ProvenHand pipeline wiki
KM Midcon Texas Pipeline Expansion is a natural gas pipeline in Texas. It entered service in 2003. It runs 8.9 miles of 30" pipe.
| KM Midcon Texas Pipeline Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Texas[1] |
| In service | 20 March 2003[1] |
| FERC docket | CP96-140[1] |
| Technical information | |
| Length | 8.9 mi[1] |
| Pipe size | 30"[1] |
| Capacity | 375 MMcf/d additional capacity (EIA)[1] |
| Cost | $32 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
KM Midcon Texas Pipeline Expansion is a natural gas pipeline in Texas. It entered service in 2003. It runs 8.9 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on KM Midcon Texas Pipeline Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.