KM Nebraska Ethanol Expansion Project
From the ProvenHand pipeline wiki
KM Nebraska Ethanol Expansion Project is a natural gas pipeline in Nebraska, operated by Kinder Morgan Energy Partners. It entered service in 2009. It runs 24.5 miles of 12", 16" pipe.
| KM Nebraska Ethanol Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] or Loop[2][sources disagree] |
| Status | In service[1] |
| Commodity | Natural gas[1][3] |
| Operator | |
| Owner and operator | |
| State | Nebraska[1][3] |
| Counties | Hall, Merrick, Nance[3] |
| In service | 24 January 2009[1] |
| FERC docket | CP08-44[1] |
| Technical information | |
| Length | 24.5 mi[1] |
| Pipe size | 12", 16"[1][3] |
| Capacity | 21.8 MMcf/d additional capacity (EIA)[1] |
| Cost | $23.9 million (EIA estimate; no dollar year given)[1] or $23,940,143[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
KM Nebraska Ethanol Expansion Project is a natural gas pipeline in Nebraska, operated by Kinder Morgan Energy Partners. It entered service in 2009. It runs 24.5 miles of 12", 16" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Project type | |
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on KM Nebraska Ethanol Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-44”. Federal Energy Regulatory Commission. 21 December 2007. Retrieved 3 October 2026.
- “Notice of request under blanket authorization, Kinder Morgan Interstate Gas Transmission LLC (CP08-44)”. FERC. 8 January 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.