KM Rockies Express (Entrega) Phase 1 Seq 1
From the ProvenHand pipeline wiki
KM Rockies Express (Entrega) Phase 1 Seq 1 is a natural gas pipeline in Colorado and Wyoming. It entered service in 2006. It runs 136 miles of 36" pipe.
| KM Rockies Express (Entrega) Phase 1 Seq 1 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Part of | EnCana Project (Rockies Express[2] |
| States | Colorado, Wyoming[1] |
| Counties | Colorado: Moffat, Rio Blanco Wyoming: Sweetwater[2] |
| Approved | 9 August 2005[2] |
| In service | 25 January 2006[1] |
| FERC docket | CP04-413[1] |
| FERC pre-filing docket | PF04-7[1] |
| Contractors | |
| Technical information | |
| Length | 136 mi[1] |
| Pipe size | 36"[1] |
| Capacity | 750 MMcf/d additional capacity (EIA)[1] |
| Cost | $180 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
KM Rockies Express (Entrega) Phase 1 Seq 1 is a natural gas pipeline in Colorado and Wyoming. It entered service in 2006. It runs 136 miles of 36" pipe.
Contractorsedit
| Contractor | Work | Scope | Spread | Years |
|---|---|---|---|---|
| U.S. Pipeline, Inc.[3] | Prime | Entrega Pipeline Spread 1: 50.51 miles of 36-inch pipeline in Colorado | Spread 1 | 1 January 2005 |
| U.S. Pipeline, Inc.[3] | Prime | Entrega Pipeline Spread 2: 85.21 miles of 36-inch pipeline in Colorado and Wyoming | Spread 2 | 1 January 2005 |
| Trigon-Sheehan LLC[4] | Engineering, procurement and construction management (EPCM) contract | EPCM contract for the Entrega Pipeline, awarded by Entrega Gas Pipeline Inc. before Leg I construction (2005) | ||
| Universal Ensco, Incorporated[4] | General construction contract (as reported; role on the spreads not stated) | General construction contract for the Entrega Pipeline, awarded by Entrega Gas Pipeline Inc. as Leg I construction was about to begin (2005) |
Spreads
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on KM Rockies Express (Entrega) Phase 1 Seq 1? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order issuing certificate(s), docket CP04-413: Order issuing certificates re Entrega Gas Pipeline Inc under CP04-413 et al.”. Federal Energy Regulatory Commission. 9 August 2005. Retrieved 4 October 2026.
- “Current Projects (archive 2005-12-27)”. U.S. Pipeline, Inc. Archived from the original on 27 December 2005. Retrieved 3 October 2026.
- “Entrega Gas Pipeline Nears Construction Phase of New Natural Gas Pipeline in the Rocky Mountains”. Industrial Info Resources. 1 September 2005. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.