Knox Energy Interconnect Project

From the ProvenHand pipeline wiki

Knox Energy Interconnect Project is a facility project, operated by Texas Gas Transmission, LLC.

Knox Energy Interconnect Project
General information
KindFacility project[1]
Owner and operator
CountiesWarren[3]
FERC docketCP08-474[2]
Technical information
Cost$561,414 (Texas Gas estimate; reimbursed by KECA)[3]
On ProvenHand
Hands listed0

Knox Energy Interconnect Project is a facility project, operated by Texas Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Knox Energy Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Status Report of Texas Gas Transmission, LLC re the Knox Energy Interconnect Project (CP08-474)”. Texas Gas Transmission, LLC (filed with FERC). 18 May 2009. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP08-474”. Federal Energy Regulatory Commission. 18 September 2008. Retrieved 3 October 2026.
  3. “Texas Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP08-474-000), Federal Register E8-22857”. Federal Energy Regulatory Commission (published in the Federal Register). 30 September 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.