KR Moapa Lateral
From the ProvenHand pipeline wiki
KR Moapa Lateral is a natural gas pipeline lateral in Nevada. It entered service in 2002. It runs 3.5 miles of 16" pipe.
| KR Moapa Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Nevada[1] |
| In service | November 2002[1] |
| FERC docket | CP01-380[1] |
| Technical information | |
| Length | 3.5 mi[1] |
| Pipe size | 16"[1] |
| Capacity | 219 MMcf/d additional capacity (EIA)[1] |
| Cost | $3.8 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
KR Moapa Lateral is a natural gas pipeline lateral in Nevada. It entered service in 2002. It runs 3.5 miles of 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on KR Moapa Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.