Lake City 1st Branch Line Abandonment and Capacity Replacement Project
From the ProvenHand pipeline wiki
Lake City 1st Branch Line Abandonment and Capacity Replacement Project is a natural gas pipeline replacement in Iowa, operated by Northern Natural Gas Company. It entered service in 2022. It runs 9.2 miles of 6" pipe.
| Lake City 1st Branch Line Abandonment and Capacity Replacement Project | |
|---|---|
| Also called | Northern Natural Gas Capacity Replacement Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Replacement[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Iowa[2][3] |
| Counties | Calhoun, Webster[3] |
| Approved | 21 June 2021[4] |
| In service | October 2022[2] |
| FERC docket | CP20-504[2] |
| Technical information | |
| Length | 9.2 mi[2][3] |
| Pipe size | 6"[2][3] |
| Cost | $19.8 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Lake City 1st Branch Line Abandonment and Capacity Replacement Project is a natural gas pipeline replacement in Iowa, operated by Northern Natural Gas Company. It entered service in 2022. It runs 9.2 miles of 6" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Lake City 1st Branch Line Abandonment and Capacity Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP20-504”. Federal Energy Regulatory Commission. 31 July 2020. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Application, Northern Natural Gas Company, Lake City 1st branch line abandonment and capacity replacement (CP20-504)”. FERC (public notice, eLibrary). 7 August 2020. Retrieved 4 October 2026.
- “Order Issuing Certificate etc., Northern Natural Gas Company (CP20-504); eLibrary posting date”. FERC (eLibrary filing description). 21 June 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.