Lakeshore Lateral Project (LLP)

From the ProvenHand pipeline wiki

Lakeshore Lateral Project (LLP) is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Electric Gas Operations. Construction began in 2020 and the line entered service in 2021. It runs 49 miles of 24" pipe.

Lakeshore Lateral Project (LLP)
General information
KindPipeline project[1]
Project typeLateral[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateWisconsin[1]
CountiesKenosha, Racine, Walworth[2]
ApprovedJune 2020[3]
Construction startedDecember 2020[3]
In service7 October 2021[1]
Technical information
Length49 mi[1]
Pipe size24"[1]
Cost$144.3 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Lakeshore Lateral Project (LLP) is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Electric Gas Operations. Construction began in 2020 and the line entered service in 2021. It runs 49 miles of 24" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Lakeshore Lateral Project (LLP)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Agricultural Impact Statements: Natural Gas Pipeline Projects”. Wisconsin Department of Agriculture, Trade and Consumer Protection. Retrieved 4 October 2026.
  3. “Wisconsin Electric Power Company Form 10-Q for the quarter ended 2021-03-31”. Wisconsin Electric Power Company (filed with the SEC). 6 May 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.