Lakeshore Lateral Project (LLP)
From the ProvenHand pipeline wiki
Lakeshore Lateral Project (LLP) is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Electric Gas Operations. Construction began in 2020 and the line entered service in 2021. It runs 49 miles of 24" pipe.
| Lakeshore Lateral Project (LLP) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Wisconsin[1] |
| Counties | Kenosha, Racine, Walworth[2] |
| Approved | June 2020[3] |
| Construction started | December 2020[3] |
| In service | 7 October 2021[1] |
| Technical information | |
| Length | 49 mi[1] |
| Pipe size | 24"[1] |
| Cost | $144.3 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Lakeshore Lateral Project (LLP) is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Electric Gas Operations. Construction began in 2020 and the line entered service in 2021. It runs 49 miles of 24" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Lakeshore Lateral Project (LLP)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Agricultural Impact Statements: Natural Gas Pipeline Projects”. Wisconsin Department of Agriculture, Trade and Consumer Protection. Retrieved 4 October 2026.
- “Wisconsin Electric Power Company Form 10-Q for the quarter ended 2021-03-31”. Wisconsin Electric Power Company (filed with the SEC). 6 May 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.