Leaf River Energy Center CP12-526

From the ProvenHand pipeline wiki

Leaf River Energy Center CP12-526 is a pipeline expansion, operated by Leaf River Energy Center LLC.

Leaf River Energy Center CP12-526
General information
Project typeExpansion[1]
Owner and operator
CountiesSmith[2]
FERC docketCP12-526[1]
On ProvenHand
Hands listed0

Leaf River Energy Center CP12-526 is a pipeline expansion, operated by Leaf River Energy Center LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Leaf River Energy Center CP12-526? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP12-526”. Federal Energy Regulatory Commission. 24 September 2012. Retrieved 3 October 2026.
  2. “Environmental assessment report, Leaf River Energy Center cavern capacity expansion (CP12-526)”. FERC (environmental assessment report). 3 January 2013. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.