Linde NG Interconnect Project

From the ProvenHand pipeline wiki

Linde NG Interconnect Project is a facility project, operated by Golden Triangle Storage, LLC. It runs 2 miles of 12" pipe.

Linde NG Interconnect Project
General information
KindFacility project[1]
Project typeLateral[2]
StatusUnder construction[3]
Owner and operator
CountiesJefferson, Orange[2]
FERC docketCP26-88[1]
Technical information
Length2 mi[2]
Pipe size12"[2]
Cost$27,000,000[2]
On ProvenHand
Hands listed0

Linde NG Interconnect Project is a facility project, operated by Golden Triangle Storage, LLC. It runs 2 miles of 12" pipe.

Crossings

FeatureMethod
Lower Neches Valley Authority (LNVA) Canal[2]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Linde NG Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-88”. Federal Energy Regulatory Commission. 12 February 2026. Retrieved 3 October 2026.
  2. “Environmental Assessment Report for Golden Triangle Storage, LLC's Sections 157.205 and 157.208 under CP26-88.”. Federal Energy Regulatory Commission (staff document). 27 April 2026. Retrieved 3 October 2026.
  3. “Golden Triangle Storage, LLC submits Weekly Construction Status Report No. 22 for the period of 09/20/2026 to 09/26/2026 re the Linde NG Interconnect Project under CP26-88.”. Golden Triangle Storage, LLC (filed with FERC). 2 October 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.