Line 100-1, 100-2 and 100-3 Pipe Replacement
From the ProvenHand pipeline wiki
Line 100-1, 100-2 and 100-3 Pipe Replacement is a natural gas pipeline replacement in Louisiana and Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
| Line 100-1, 100-2 and 100-3 Pipe Replacement | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | Approved[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | Louisiana, Texas[2] |
| FERC docket | CP23-499[1] |
| Technical information | |
| Pipe size | 24", 30"[2] |
| Cost | $21,236,654[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line 100-1, 100-2 and 100-3 Pipe Replacement is a natural gas pipeline replacement in Louisiana and Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 100-1, 100-2 and 100-3 Pipe Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP23-499”. Federal Energy Regulatory Commission. 20 June 2023. Retrieved 3 October 2026.
- “Environmental Assessment Report, pipe replacement on Line Nos. 100-1, 100-2 and 100-3 (CP23-499)”. FERC. 18 July 2023. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.