Line 100-1, 100-2 and 100-3 Pipe Replacement (CP23-53)
From the ProvenHand pipeline wiki
Line 100-1, 100-2 and 100-3 Pipe Replacement (CP23-53) is a natural gas pipeline in Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
| Line 100-1, 100-2 and 100-3 Pipe Replacement (CP23-53) | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | Approved[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Texas[1] |
| Counties | Fort Bend, Harris, Waller[1] |
| FERC docket | CP23-53[2] |
| Technical information | |
| Pipe size | 24", 30"[1] |
| Cost | $27,979,403[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line 100-1, 100-2 and 100-3 Pipe Replacement (CP23-53) is a natural gas pipeline in Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 100-1, 100-2 and 100-3 Pipe Replacement (CP23-53)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, pipe replacement on Line Nos. 100-1, 100-2 and 100-3 (CP23-53)”. FERC. 15 February 2023. Retrieved 4 October 2026.
- “FERC eLibrary docket CP23-53”. Federal Energy Regulatory Commission. 6 February 2023. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.