Line 100-2 and 100-3 Pipe Replacement
From the ProvenHand pipeline wiki
Line 100-2 and 100-3 Pipe Replacement is a natural gas pipeline replacement in Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
| Line 100-2 and 100-3 Pipe Replacement | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | Approved[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Texas[2] |
| Counties | Fort Bend, Harris, Montgomery, Waller[2] |
| FERC docket | CP22-464[1] |
| Technical information | |
| Pipe size | 30"[2] |
| Cost | $18,685,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line 100-2 and 100-3 Pipe Replacement is a natural gas pipeline replacement in Texas, operated by Tennessee Gas Pipeline Company, L.L.C..
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 100-2 and 100-3 Pipe Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-464”. Federal Energy Regulatory Commission. 27 May 2022. Retrieved 3 October 2026.
- “30-day advance notification under 18 CFR 2.55(b), pipe replacement on Line Nos. 100-2 and 100-3 (CP22-464)”. Tennessee Gas Pipeline Company, L.L.C. (filed with FERC). 27 May 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.