Line 1360 Panel 7N6W to 7N7W Connector
From the ProvenHand pipeline wiki
Line 1360 Panel 7N6W to 7N7W Connector is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC.
| Line 1360 Panel 7N6W to 7N7W Connector | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | West Virginia[1] |
| Approved | 29 July 2025[1] |
| West Virginia stormwater permit | WVR312506[1] |
| On ProvenHand | |
| Hands listed | 0 |
Line 1360 Panel 7N6W to 7N7W Connector is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 1360 Panel 7N6W to 7N7W Connector? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.