Line 1570-Line 1983 Crossover is a pipeline project in Pennsylvania, operated by Columbia Gas Transmission, LLC.
| Line 1570-Line 1983 Crossover | |
|---|---|
| Also called | Taylor Gate Crossover[1] |
| General information | |
| Status | Approved[1] |
| Owner and operator | |
| State | Pennsylvania[3] |
| Counties | Greene, PA[3] or Washington, PA[1][sources disagree] |
| FERC docket | CP16-151[2] |
| Technical information | |
| Pipe size | 12"[3] |
| On ProvenHand | |
| Hands listed | 0 |
Line 1570-Line 1983 Crossover is a pipeline project in Pennsylvania, operated by Columbia Gas Transmission, LLC.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 1570-Line 1983 Crossover? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Advance notification under 2.55(a), Taylor Gate Crossover (CP16-151)”. Columbia Gas Transmission, LLC (filed with FERC). 13 April 2016. Retrieved 4 October 2026.
- “FERC eLibrary docket CP16-151”. Federal Energy Regulatory Commission. 13 April 2016. Retrieved 3 October 2026.
- “Environmental Assessment Report, Line 1570-Line 1983 Crossover (CP16-151)”. FERC. 28 April 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.