Line 1570 Longwall Mining Panel 9N7W is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC. It runs 0.3 miles of 20" pipe.

Line 1570 Longwall Mining Panel 9N7W
General information
KindPipeline project[1]
Owner and operator
StateWest Virginia[1]
CountiesWetzel[3]
Approved20 January 2026[1]
FERC docketCP26-522[3]
West Virginia stormwater permitWVR312589[1]
Technical information
Length0.3 mi[3]
Pipe size20"[3]
On ProvenHand
Hands listed0

Line 1570 Longwall Mining Panel 9N7W is a pipeline project in West Virginia, operated by Columbia Gas Transmission, LLC. It runs 0.3 miles of 20" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 1570 Longwall Mining Panel 9N7W? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “WVDEP: Oil and Gas Construction Stormwater registrations”. West Virginia Department of Environmental Protection. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP26-522”. Federal Energy Regulatory Commission. 13 May 2026. Retrieved 3 October 2026.
  3. “FERC letter approving additional workspace, Line 1570 Longwall Mining Mitigation Panel 9N7W Project (CP26-522)”. Federal Energy Regulatory Commission, Office of Energy Projects. 20 May 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.