Line 1655 Replacement Project (York and Adams Counties)

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Line 1655 Replacement Project (York and Adams Counties) is a pipeline project in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 6.5 miles of 10" pipe.

Line 1655 Replacement Project (York and Adams Counties)
Also calledHanover Replacement Project[1]
General information
StatusIn service[2]
Owner and operator
StatePennsylvania[4]
CountiesAdams, York[4]
Construction started2015[1]
FERC docketCP15-11[3]
Technical information
Length6.5 mi[5]
Pipe size10"[4]
Cost$21,400,000[6] or roughly $18 million (Columbia Pipeline Group project page)[7][sources disagree]
On ProvenHand
Hands listed0

Line 1655 Replacement Project (York and Adams Counties) is a pipeline project in Pennsylvania, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 6.5 miles of 10" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $21,400,000[6]
  • roughly $18 million (Columbia Pipeline Group project page)[7]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 1655 Replacement Project (York and Adams Counties)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Construction status report, March 30 to April 6, 2015, Hanover Replacement Project (CP15-11)”. Columbia Gas Transmission, LLC (filed with FERC). 10 April 2015. Retrieved 4 October 2026.
  2. “Construction status report, October 1 to 7, 2015, Hanover Replacement Project (CP15-11)”. Columbia Gas Transmission, LLC (filed with FERC). 8 October 2015. Retrieved 4 October 2026.
  3. “FERC eLibrary docket CP15-11”. Federal Energy Regulatory Commission. 4 November 2014. Retrieved 3 October 2026.
  4. “FERC notice of request under blanket authorization, Line 1655 Replacement Project (York and Adams Counties) (CP15-11)”. FERC. 14 November 2014. Retrieved 4 October 2026.
  5. “Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization (Docket No. CP15-11-000), Federal Register 2014-27553”. Federal Energy Regulatory Commission (published in the Federal Register). 21 November 2014. Retrieved 4 October 2026.
  6. “Environmental Assessment Report, Line 1655 Replacement Project (York and Adams Counties) (CP15-11)”. FERC. 14 January 2015. Retrieved 4 October 2026.
  7. “Hanover Replacement Project (project page, archived 2015-08-11)”. Columbia Pipeline Group. Archived from the original on 11 August 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.