Line 2000 Power-UP Project (Phase I) Phase I
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Line 2000 Power-UP Project (Phase I) Phase I is a facility project in Arizona, New Mexico and Texas, operated by El Paso Natural Gas Company, L.L.C..
| Line 2000 Power-UP Project (Phase I) Phase I | |
|---|---|
| Also called | Line 2000 Power-Up Project (Phase II) Phase II[1], Line 2000 Power-Up Project (Phase III) Phase III[1] |
| General information | |
| Kind | Facility project[1] |
| Owner and operator | |
| States | Arizona, New Mexico, Texas[1] |
| Approved | 4 June 2003[1] |
| FERC docket | CP03-1[1] |
| Technical information | |
| Capacity added | 120 MMcf/d (FERC project list)[1] or 100 MMcf/d (FERC project list)[1][sources disagree] |
| Horsepower added | 73,720 hp[1] or 45,000 hp[1] or 32,880 hp[1][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Line 2000 Power-UP Project (Phase I) Phase I is a facility project in Arizona, New Mexico and Texas, operated by El Paso Natural Gas Company, L.L.C..
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity added | |
| Horsepower added |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 2000 Power-UP Project (Phase I) Phase I? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.