Line 261 B Looping Project

From the ProvenHand pipeline wiki

Line 261 B Looping Project is a pipeline loop in Massachusetts, operated by Kinder Morgan. It entered service in 2020. It runs 2.1 miles of 12" pipe.

Line 261 B Looping Project
General information
KindPipeline project[1]
Project typeLoop[1]
StatusIn service[2]
Owner
Part of261 Upgrade Projects[3]
StateMassachusetts[1]
CountiesHampden[3]
Approved19 December 2019[4]
In service1 November 2020[2]
FERC docketCP19-7[2]
Contractors
Technical information
Length2.1 mi[1]
Pipe size12"[1]
On ProvenHand
Hands listed0

Line 261 B Looping Project is a pipeline loop in Massachusetts, operated by Kinder Morgan. It entered service in 2020. It runs 2.1 miles of 12" pipe.

Contractorsedit

ContractorWorkScopeYears
U.S. Pipeline, Inc.[1]PrimeInstallation of 2.1 miles of 12-inch pipeline and removal of 1 mile of 6-inch pipeline1 January 2020

Crossings

FeatureMethod
Shoemaker Lane[3]HDD

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 261 B Looping Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Recent Projects - U.S. Pipeline (project map)”. U.S. Pipeline, Inc. Retrieved 3 October 2026.
  2. “Notification of in-service date for Looping Project, 261 Upgrade Projects, Tennessee Gas Pipeline Company, L.L.C. (CP19-7)”. Federal Energy Regulatory Commission (eLibrary filing). 5 November 2020. Retrieved 4 October 2026.
  3. “261 Upgrade Project Environmental Assessment (CP19-7-000)”. Federal Energy Regulatory Commission, Office of Energy Projects. May 2019. Retrieved 4 October 2026.
  4. “Order Issuing Certificate and Approving Abandonment, Tennessee Gas Pipeline Company, L.L.C. (CP19-7)”. Federal Energy Regulatory Commission. 19 December 2019. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.