Line 3 Pembina County Maintenance Project
From the ProvenHand pipeline wiki
Line 3 Pembina County Maintenance Project is a crude oil pipeline replacement in North Dakota, operated by Enbridge Energy, Limited Partnership. It runs 12.3 miles of 36" pipe.
| Line 3 Pembina County Maintenance Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[2] |
| Status | In service[3] |
| Commodity | Crude oil[2] |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | Pembina[4] |
| North Dakota PSC case | PU-19-192[1] |
| Technical information | |
| Length | 12.3 mi[2] |
| Pipe size | 36"[2] |
| Wall thickness | 0.515, 0.6 and 0.75 in[5] |
| Grade | X70[5] |
| Mill coating | FBE 14-16 mils; HDD and crossing pipe also with ARO overlay[5] |
| On ProvenHand | |
| Hands listed | 0 |
Line 3 Pembina County Maintenance Project is a crude oil pipeline replacement in North Dakota, operated by Enbridge Energy, Limited Partnership. It runs 12.3 miles of 36" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 3 Pembina County Maintenance Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “North Dakota Public Service Commission: case search (pipeline siting)”. North Dakota Public Service Commission. Retrieved 3 October 2026.
- “Cover letter for the certification under N.D.C.C. 49-22.1-01(3), Enbridge Line 3 segment replacement (12.3 miles of 36-inch), PU-19-192”. Enbridge Energy, Limited Partnership (filed with the North Dakota Public Service Commission). 6 June 2019. Retrieved 3 October 2026.
- “Line 3 Replacement Project Substantially Completed and Set to be Fully Operational (news release)”. Enbridge Inc. 29 September 2021. Retrieved 3 October 2026.
- “Corrected cover letter (Pembina County), Enbridge Line 3 Pembina County maintenance project, PU-19-192”. Enbridge Energy, Limited Partnership (filed with the North Dakota Public Service Commission). 25 June 2019. Retrieved 3 October 2026.
- “Pipe specification sheet in the certification filing, Enbridge Line 3 segment replacement, PU-19-192”. Enbridge Energy, Limited Partnership (filed with the North Dakota Public Service Commission). 6 June 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.