Line 3 Replacement (US)
From the ProvenHand pipeline wiki
Line 3 Replacement (US) is a crude oil pipeline in North Dakota, Minnesota and Wisconsin, operated by Enbridge. Construction began in 2017 and the line entered service in 2021. It runs 364 miles of 36" pipe.[1]
| Line 3 Replacement (US) | |
|---|---|
| Also called | Line 3, Line 3 Replacement, L3R |
| General information | |
| Commodity | Crude oil |
| Operator | Enbridge |
| States | North Dakota, Minnesota, Wisconsin |
| Construction started | 2017 |
| In service | 2021 |
| Contractors |
|
| Technical information | |
| Length | 364 mi |
| Pipe size | 36" |
| On ProvenHand | |
| Hands listed | 0 |
Line 3 Replacement (US) is a crude oil pipeline in North Dakota, Minnesota and Wisconsin, operated by Enbridge. Construction began in 2017 and the line entered service in 2021. It runs 364 miles of 36" pipe.[1]
Contractorsedit
| Contractor | Scope |
|---|---|
| Precision Pipeline[4] | 233.3 miles of 36-inch in Minnesota (2020-2021) |
| Michels Pipeline[5] | 109 miles of 36-inch and six mainline valve sites |
| Michels[6] | Wisconsin segment (12 miles, Douglas County) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 3 Replacement (US)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- ogj.com
- wpr.org
- enbridge.com
- precisionpipelinellc.com
- michels.us
- s3.amazonaws.com · Ongoing-ilovepdf-compressed.pdf
This pipeline article is a stub. You can help ProvenHand by expanding it.