Line 40 Connection Project is a natural gas pipeline expansion in Louisiana, operated by Texas Eastern Transmission, LP. It entered service in 2023. It runs 0.2 miles of 30" pipe.
| Line 40 Connection Project | |
|---|---|
| Also called | Gator Express Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2][3] |
| Commodity | Natural gas[2][4] |
| Owner and operator | |
| Operator | |
| State | Louisiana[2][4] |
| Counties | Plaquemines[4] |
| In service | 25 August 2023[2] |
| FERC docket | CP22-43[1] |
| Technical information | |
| Length | 0.2 mi[2] |
| Pipe size | 30"[4] |
| Cost | $30.6 million (EIA estimate; no dollar year given)[2][4] |
| On ProvenHand | |
| Hands listed | 0 |
Line 40 Connection Project is a natural gas pipeline expansion in Louisiana, operated by Texas Eastern Transmission, LP. It entered service in 2023. It runs 0.2 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 40 Connection Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP22-43”. Federal Energy Regulatory Commission. 27 January 2022. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Final weekly report (Aug 20 to 26, 2023), Line 40 Connection Project (CP22-43)”. Texas Eastern Transmission, LP (filed with FERC). 13 November 2023. Retrieved 4 October 2026.
- “Environmental Assessment Report, Line 40 Connection Project (CP22-43)”. FERC. 7 April 2022. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.