Line 79
From the ProvenHand pipeline wiki
Line 79 is a crude oil pipeline in Michigan, operated by Enbridge Energy, Limited Partnership. It runs 35.2 miles of 20" pipe.
| Line 79 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[2] |
| Commodity | Crude oil[2] |
| Owner | |
| Operator | |
| State | Michigan[1] |
| Counties | Ingham, Jackson, Washtenaw, Wayne[3] |
| Contractors | |
| Technical information | |
| Length | 35.2 mi[3] |
| Pipe size | 20"[2] |
| On ProvenHand | |
| Hands listed | 0 |
Line 79 is a crude oil pipeline in Michigan, operated by Enbridge Energy, Limited Partnership. It runs 35.2 miles of 20" pipe.
Contractorsedit
| Contractor | Work | Scope | Years |
|---|---|---|---|
| Precision Pipeline, LLC[1] | Prime | 33.3 miles of 20-inch, Michigan | until 1 January 2012 |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Line 79? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “All Projects - Precision Pipeline, LLC | Infrastructure and Utility Pipeline Contractor”. Precision Pipeline, LLC. Retrieved 3 October 2026.
- “Pre-filed direct testimony and exhibits, Enbridge Pipelines (Toledo) Inc., MPSC Case No. U-16937 (Line 79)”. Enbridge Pipelines (Toledo) Inc. (filed with the Michigan Public Service Commission). Retrieved 3 October 2026.
- “Enbridge Line 79 maps and project description (MPSC Case No. U-16937, Exhibit A-2; preliminary PSC submittal dated 12/15/2011)”. Enbridge (filed with the Michigan Public Service Commission; copy posted by AnnArbor.com). Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.