Line 9260 and Line 9230 Make Piggable Project

From the ProvenHand pipeline wiki

Line 9260 and Line 9230 Make Piggable Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

Line 9260 and Line 9230 Make Piggable Project
General information
KindPipeline project[1]
StatusUnder construction[2]
Owner and operator
CountiesWashington[3]
Approved7 July 2026[4]
FERC docketCP26-291[1]
Technical information
Cost$14 million[3]
On ProvenHand
Hands listed0

Line 9260 and Line 9230 Make Piggable Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line 9260 and Line 9230 Make Piggable Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-291”. Federal Energy Regulatory Commission. 24 April 2026. Retrieved 3 October 2026.
  2. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 11 for the period of 09/21/2026 to 09/27/2026 re the Line 9260 and Line 9230 Make Piggable Project under CP26-291.”. Columbia Gas Transmission, LLC (filed with FERC). 1 October 2026. Retrieved 3 October 2026.
  3. “Environmental Assessment Report for Columbia Gas Transmission, LLC's Sections 157.205, 157.213, and 157.216 filings under CP26-291.”. Federal Energy Regulatory Commission (staff document). 6 July 2026. Retrieved 3 October 2026.
  4. “Columbia Gas Transmission, LLC submits Weekly Construction Status Report No. 1 for the period of 07/13/2026 to 07/19/2026 re the Line 9260 and Line 9230 Make Piggable Project under CP26-291.”. Columbia Gas Transmission, LLC (filed with FERC). 30 July 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.