Line A Replacement Project (Hope to Emmet)

From the ProvenHand pipeline wiki

Line A Replacement Project (Hope to Emmet) is a pipeline replacement in Arkansas, operated by Centerpoint Energy. Construction began in 2013. It runs 12 miles of 12" pipe.

Line A Replacement Project (Hope to Emmet)
General information
KindPipeline project[1]
Project typeReplacement[2]
StatusIn service[3]
Owner and operator
StateArkansas[1]
CountiesHempstead, Nevada[1]
Construction started1 May 2013[4]
FERC docketCP13-63[2]
Technical information
Length12 mi[1]
Pipe size12"[1]
Cost$11,500,000[1]
On ProvenHand
Hands listed0

Line A Replacement Project (Hope to Emmet) is a pipeline replacement in Arkansas, operated by Centerpoint Energy. Construction began in 2013. It runs 12 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Line A Replacement Project (Hope to Emmet)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report, Line A Replacement Project (Hope to Emmet) (CP13-63)”. FERC. 12 April 2013. Retrieved 4 October 2026.
  2. “FERC eLibrary docket CP13-63”. Federal Energy Regulatory Commission. 31 January 2013. Retrieved 3 October 2026.
  3. “Final weekly environmental inspector report, November 8 to 14, 2013, Line A Replacement Project (Hope to Emmet) (CP13-63)”. Enable Gas Transmission, LLC (filed with FERC). 15 November 2013. Retrieved 4 October 2026.
  4. “Line A Replacement Project (Hope to Emmet) weekly status report, April 30 to May 2, 2013 (CP13-63)”. CenterPoint Energy Gas Transmission Company, LLC (filed with FERC). 3 May 2013. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.